Ground-mounted photovoltaic plant in hilly countryside, with the title: Hail and photovoltaics, summer 2026 – How much can modules really withstand?, Part 1 of 3
Approfondimenti tecnici e normativi

Hail and photovoltaics, summer 2026: how much can modules really withstand?

The minimum hail test of IEC 61215 uses 25 mm ice balls, carrying about 2 joules per impact. In the results published in the Kiwa PVEL 2026 Scorecard, at 45 mm glass breakage affects 61% of the sample of 2.0 + 2.0 mm glass-glass modules, against 7% of the thicker-glass group. Part one of a three-part series: construction features, certifications and tests for assessing module resistance.

Hail and photovoltaics, summer 2026: how much can modules really withstand? Leggi tutto »

Impianto fotovoltaico a terra in un paesaggio collinare, con il titolo: Grandine e fotovoltaico, estate 2026 – Quanto resistono davvero i moduli, Parte 1 di 3
Approfondimenti tecnici e normativi

Grandine e fotovoltaico, estate 2026: quanto resistono davvero i moduli

La prova minima di grandine della IEC 61215 impiega sfere da 25 mm, con un’energia di circa 2 joule per colpo. Nei risultati pubblicati nella Scorecard 2026 di Kiwa PVEL, a 45 mm la rottura del vetro interessa il 61% del campione di moduli vetro-vetro 2,0 + 2,0 mm, contro il 7% del gruppo con vetri più spessi. Prima parte di una serie in tre: caratteristiche costruttive, certificazioni e prove per valutare la resistenza dei moduli.

Grandine e fotovoltaico, estate 2026: quanto resistono davvero i moduli Leggi tutto »

Two workers on scaffolding against the sky: cover of the analysis on credit-based licensing on Italian construction sites.
Attualità

Credit-based licensing on Italian construction sites: proof is still the weak link

Higher penalties and uncapped credit deductions for undeclared labour are in force. The site badge is not: of the twelve implementing measures required by Decree-Law 159/2025, two have been adopted and none of the three under article 3. What it means for investigating a workplace accident.

Credit-based licensing on Italian construction sites: proof is still the weak link Leggi tutto »

A road and embankment scoured away by a flood, with the swollen river running through the breach — cover of the English version of the CONSAP Register analysis.
Approfondimenti tecnici e normativi

Who Will Be Entitled to Adjust Catastrophe Losses? — Article 19 of Decree-Law 25/2026 and Article 23 of Decree-Law 144/2026

The CONSAP Register established by Article 19 of Decree-Law 25/2026 reserves to those enrolled the assessment of catastrophe losses to insured buildings, backed by a criminal sanction. In little over five months the entry requirements have changed twice. Who can enrol today, what is required in the transitional window open until 1 April 2028, and what is still missing before the Register exists as a working procedure.

Who Will Be Entitled to Adjust Catastrophe Losses? — Article 19 of Decree-Law 25/2026 and Article 23 of Decree-Law 144/2026 Leggi tutto »